TDC GROUP / PARTNER PRESENTATION

EV Charging Stations
Partnerships & Investment

Every electric journey needs dependable charging. Every car park can become a new way to serve drivers. Across global markets, TDC connects charging equipment, digital platforms and regional partners to develop stations and operating models that meet local needs.

Whether you know the local customer base, own a suitable site or seek a business with recurring operating potential, a real customer need is the starting point for working with TDC. From equipment selection and financial modelling to delivery and local support, we help turn a station opportunity into a platform for wider market development.

Choose your partnership route ↓

TDC charging site / Passenger and commercial vehicle charging

TDC charging site showing the complete canopy, brand signage, charging bays and parked vehicles
TDC ENERGY GROUP

Made in China. Operating worldwide.

For a distributor, delivery is only the beginning of the customer's questions: who helps open the station, how do drivers pay, and who responds if equipment stops? TDC connects R&D at its Shenzhen headquarters, production in Guangzhou and local service from six overseas regional teams, supporting partners from their first equipment order to station opening.

200+ people Combined headcount at Shenzhen HQ and Guangzhou factory
6 regions Overseas business teams working with local partners
100+ projects Station development projects participated in to date
30+ sites Sites using the TDC Charge operating app
20+ sites Completed shared charging sites for logistics fleets
3 countries Platform launched in Thailand, Spain and Mexico

From equipment supply to the first payment

Hong Kong-based TDC ENERGY LIMITED coordinates international business. In Thailand, TDC ENERGY CO., LTD. helps landowners plan and develop stations and also invests in company-operated sites. Owners can use the in-house TDC Charge platform to manage equipment, charge drivers and reconcile payments. Distributors can therefore bring equipment, installation and ongoing service into one partnership proposal.

One manufacturing foundation. Different market needs.

In Los Angeles, logistics companies share eight sites, with power capacity matched to fleet return schedules. In Europe, TDC has signed a partnership to deploy BOX 522 storage-and-charging equipment towards a target of 200 sites over five years. The Latin America team is based in Mexico and develops Brazil and Colombia, while the Middle East and Africa teams select solutions around local vehicles, electricity supply and installation conditions.

Meet the delivery and operations team →
TDC MANUFACTURING / R&D / DELIVERY

Behind every order is a complete delivery capability

From batch assembly on the production line and live equipment integration in the lab to international shipment and local commissioning, TDC connects products, platforms and engineering teams. We support your project with organised manufacturing, R&D collaboration that addresses site issues, and clearly defined delivery responsibilities.

Production PlanningHands-on R&DSystem IntegrationRegional Delivery Support
Production floor panorama | Equipment assembly, packing and dispatch organised by batch.
Production lines demonstrate executionEnclosures, electrical components and control systems are assembled, checked and jointly inspected against the agreed equipment configuration.
Complete systems demonstrate integrationEquipment is connected to test apparatus to verify interfaces, system coordination and the conditions required for actual deployment.
The laboratory demonstrates problem-solvingEngineering teams use actual chargers, vehicles and diagnostic tools to develop equipment functions and platform interoperability.
01 / MANUFACTURE

Batch production that follows your project schedule

Model families, connectors, quantities and configuration requirements are translated into an equipment schedule, coordinating assembly, inspection, packing and dispatch. Both the first station and future expansion begin with an agreed configuration and programme.

What matters to you: what is supplied, in how many batches, and how delivery aligns with construction.
02 / ENGINEERING

R&D collaboration for real-world operation

Technical reviews cover vehicle charging acceptance, control logic, OCPP communication and platform transactions. Site feedback returns to the R&D and debugging process, with clear ownership for equipment selection, platform connection and issue resolution.

What matters to you: compatibility, integration steps and who follows up on issues.
03 / DELIVERY

A coordinated handover to local operation

Headquarters and regional partners agree responsibilities for supply, transport, construction, activation and acceptance. Local training and service arrangements bring the work after equipment arrival into the project plan from the outset.

What matters to you: who installs, how acceptance works and whom to contact after opening.

Confidence comes from knowing the next step

Technical, supply and site responsibilities become verifiable delivery milestones, as agreed for each project.

  1. 01Confirm requirements and configuration

    Vehicles, connectors, power, supply and platform requirements

    Deliverable: configuration approval and responsibilities
  2. 02Production and equipment inspection

    Configuration checks, component assembly and agreed inspections

    Deliverable: equipment list and batch schedule
  3. 03Equipment and platform integration

    Verify start, stop, communication and transaction records

    Deliverable: agreed tests and issue follow-up
  4. 04Packing and dispatch coordination

    Equipment identification, protective packing and transport responsibilities

    Deliverable: packing and shipment documentation
  5. 05Local acceptance and service

    Site testing, operator handover and service contacts

    Deliverable: acceptance and service handover arrangements
From the first delivery to a lasting partnership

Put your project in the hands of a coordinated team

Manufacturing organises supply. R&D provides technical follow-through. Regional partners give your site a local point of contact. Bring your site, vehicle requirements and construction timetable to TDC, and we can work together on an executable project plan.

Meet the team behind delivery →
1 / 4

TDC PEOPLE

Meet the people who will build with you

Bring your first site or your fleet schedule. From investment decisions and equipment delivery to the first charging payment after opening, you can find the team responsible for each step here.

Group Leadership

Recent portrait of Tommy
Group Strategy & Investment

Tommy

Founder & Chief Executive Officer (CEO)

Major projects, investment direction and international partnerships

Is this land worth developing into a charging station?

Originally from Hong Kong, Tommy earned a degree in information technology in the UK. He founded TDC and, together with Doris and Chris, has expanded its Shenzhen equipment business into overseas station development and operations. For a new site, he focuses on who will charge there, what each partner contributes and when expansion makes sense.

Recent portrait of Doris
Group Operations & Delivery

Doris

Chief Operating Officer (COO)

Supply schedules, delivery responsibilities and after-sales coordination

After signing, who gets the equipment to a site ready to open?

Doris oversees internal operations, coordinating production, procurement, finance and after-sales teams. When site construction and shipping schedules do not align, she works with both sides to adjust the programme, so customers know who follows up next and what remains before opening.

Recent portrait of Chris
Product Development & Project Engineering

Chris

Chief Technology Officer (CTO)

Equipment selection, system integration and technical acceptance

How should power be allocated when six vehicles arrive together?

Chris leads the charging product lines and platform technology and is the final technical owner for project solutions. His team translates vehicle requirements, incoming supply capacity and peak demand into equipment configurations, checking everything from connector output to platform transaction records to support evidence-based acceptance.

Regional Business Team

Recent portrait of Victor
TDC AMERICA

Victor

Regional Director, North America

Logistics fleets, high-power station development and shared operations

How do several logistics companies share one station?

Victor leads North American business and operations. Eight shared sites in Los Angeles serve multiple logistics companies, allowing discussions to start with real fleet schedules. With return and departure times in hand, he coordinates assessment of peak power, bay turnover and future expansion.

Recent portrait of Harold
TDC EUROPE

Harold

Regional Director, Europe

European site partnerships, storage-and-charging solutions and phased delivery

How does a five-year network plan become individual sites?

Belgian-born Harold is responsible for markets including Spain, Germany, France and Belgium. He coordinates landowners and equipment partners, progressing projects according to electricity supply and construction readiness. BOX 522 is a core product in the European partnership plan, which targets 200 sites over five years.

Recent portrait of Nay
TDC THAI

Nay

Regional Director, Southeast Asia

Thai station development, platform integration and Southeast Asian partnerships

Who takes over locally after the first Thai station opens?

Nay is responsible for Thailand, Laos and Cambodia. Since 2023, he has supported the establishment of Thai operations, equipment connectivity tests, warehousing and repairs. Landowners can bring site and electricity supply information to discuss configurations, payment activation and maintenance after opening.

Recent portrait of Lio
TDC LATIN

Lio

Regional Director, Latin America

Mexico network development and channels in Brazil and Colombia

Who leads locally as the charging network expands?

Based in Mexico, Lio coordinates charging network projects with the Mexican government and develops the Brazilian and Colombian markets. For prospective distributors, he brings together local vehicle requirements, installation teams and the first demonstration site, aligning equipment supply with local service.

Recent portrait of Amir
TDC UAE

Amir

Regional Director, Middle East

Middle Eastern channels, engineering requirements and local technical coordination

How do you confirm suitability across three markets?

Originally from Iran, Amir covers the UAE, Oman and Iran. He works with distributors and site owners to confirm vehicles, power supply and installation conditions site by site, then coordinates quotations, commissioning and spare parts with headquarters so local service responsibilities are clear before purchase.

Recent portrait of Marlin
TDC AFRICA

Marlin

Regional Director, Africa

African market requirements, initial site assessment and technical coordination

What options can be assessed when site power is limited?

Marlin is the business contact for African markets. For a South African site considering solar and DC fast charging, he first reviews incoming supply, daytime consumption and vehicle dwell times, then involves the technical team to compare grid, solar and storage configurations.

PARTNERSHIPS

What You Bring. How We Work Together.

Local market knowledge connects customers. Suitable sites capture traffic. Capital gives a project room to develop. TDC combines equipment, platforms and delivery support to connect these strengths: identify real demand, agree who invests, delivers and operates, then use actual charging transactions to assess business performance.

Four partners. One operational charging project.Select a role to explore contributions and support
THE COORDINATING PARTNER

TDC turns shared strengths into an executable plan

Together, assess the site and demand; confirm equipment, power, platform and local service responsibilities; and align customers, land and capital around one construction and operating plan.

Shared outcomesA practical station configuration+Coordinated delivery and service+Verifiable operating records

Role portraits are illustrative. Participants and cooperation models are selected for each project; contributions, service responsibilities and revenue allocation are agreed in writing.

Distributors | Make the first station a delivery reference—and service a lasting relationshipExplore distributor support →
You bring

Customer demand, local channels and appropriately qualified engineering and service resources.

TDC supports

Configuration reviews, technical documentation, platform integration, first-site collaboration, training and issue escalation arrangements.

Value we create together

Start with equipment sales, then extend into agreed installation coordination, preventive maintenance and multi-site expansion services.

ONE PROJECT / ONE SHARED TARGET

One set of inputs. One operating target for every partner.

Translate expected vehicle visits into energy, profit and the traffic required for payback—then discuss each partner's contribution.

Adjustable illustrative model
Station equipment configuration3 × 240 kWCharger count × rated power per charger
Estimated monthly energy from served visits72,000kWh / month
Monthly operating profit297,960THB / month
Required for a 24-month simple payback target51visits / day, rounded up
Compare targets:
Expected daily visits60 visits / day
Visits needed for the payback target51 visits / day
Agree three decisions using the same operating evidence

Distributors assess customer and service resources. Landowners compare cooperation models. Investors review traffic, total capital and operating costs. TDC supports equipment, platforms and delivery so every party can decide on the same project basis.

Open the full calculator to adjust equipment, traffic and tariffs →

The illustrative daily traffic covers the selected payback target's requirement.

View assumptions and calculation basis

40 kWh per visit, 30 days per month; charging price THB 7.9/kWh, electricity purchase THB 3.2/kWh, banking fee 5% of charging revenue, monthly operating costs THB 12,000 and total investment THB 6,000,000. Inputs are shared with INVESTMENT CASE.

Required visits = (total investment ÷ target months + monthly operating costs) ÷ [40 kWh × 30 days × (charging price × 95% − electricity price)], rounded up and subject to theoretical equipment capacity. Operating profit is a simple estimate before tax, financing and depreciation; it excludes ramp-up, conversion losses, replacement expenditure and other revenue streams. Charging profit, land rent and distributor service income are not added together again in this example; allocation is determined by agreement.

GLOBAL NETWORK

Global Business Development Markets

Colours highlight the markets served by each business region. Labels identify regional contacts, supported by Shenzhen headquarters and the Hong Kong international business team for cross-border projects.

FijiUnited Republic of TanzaniaWestern SaharaCanadaUnited States of AmericaKazakhstanUzbekistanPapua New GuineaIndonesiaArgentinaChileDemocratic Republic of the CongoSomaliaKenyaSudanChadHaitiDominican RepublicRussiaThe BahamasFalkland IslandsNorwayGreenlandFrench Southern and Antarctic LandsEast TimorSouth AfricaLesothoMexicoUruguayBrazilBoliviaPeruColombiaPanamaCosta RicaNicaraguaHondurasEl SalvadorGuatemalaBelizeVenezuelaGuyanaSurinameFranceEcuadorPuerto RicoJamaicaCubaZimbabweBotswanaNamibiaSenegalMaliMauritaniaBeninNigerNigeriaCameroonTogoGhanaIvory CoastGuineaGuinea-BissauLiberiaSierra LeoneBurkina FasoCentral African RepublicRepublic of the CongoGabonEquatorial GuineaZambiaMalawiMozambiqueeSwatiniAngolaBurundiIsraelLebanonMadagascarPalestineGambiaTunisiaAlgeriaJordanUnited Arab EmiratesQatarKuwaitIraqOmanVanuatuCambodiaThailandLaosMyanmarVietnamNorth KoreaSouth KoreaMongoliaIndiaBangladeshBhutanNepalPakistanAfghanistanTajikistanKyrgyzstanTurkmenistanIranSyriaArmeniaSwedenBelarusUkrainePolandAustriaHungaryMoldovaRomaniaLithuaniaLatviaEstoniaGermanyBulgariaGreeceTurkeyAlbaniaCroatiaSwitzerlandLuxembourgBelgiumNetherlandsPortugalSpainIrelandNew CaledoniaSolomon IslandsNew ZealandAustraliaSri LankaChinaTaiwanItalyDenmarkUnited KingdomIcelandAzerbaijanGeorgiaPhilippinesMalaysiaBruneiSloveniaFinlandSlovakiaCzechiaEritreaJapanParaguayYemenSaudi ArabiaNorthern CyprusCyprusMoroccoEgyptLibyaEthiopiaDjiboutiSomalilandUgandaRwandaBosnia and HerzegovinaNorth MacedoniaRepublic of SerbiaMontenegroKosovoTrinidad and TobagoSouth SudanAMERICAVictor 8 shared sites → Fleet growth LATINLio Mexico network → Brazil, Colombia EUROPEHarold Under way → 200-site / 5-year target UAEAmir Partners → Pilots → Local delivery THAINay Thai network → Laos, Cambodia HQShenzhen headquartersGuangzhou factoryOver 200 people combinedAFRICA · Marlin S. Africa: sites & power

Portrait of Victor TDC AMERICA / Victor · North American logistics fleets

Year 1 Build on eight completed shared sites in Los Angeles to review fleet routes and charging windows after vehicles return.

Years 2–3 Discuss new partnerships at logistics nodes with steady fleet demand, adding connectors or sites according to actual utilisation.

Years 4–5 Extend experience in shared-fleet scheduling, maintenance and reconciliation to other logistics markets.

Portrait of Lio TDC LATIN / Lio · Mexico, Brazil & Colombia

Year 1 Use Mexico as the regional base to coordinate site and equipment needs for charging projects developed with the Mexican government.

Years 2–3 Develop distributor relationships, equipment selection and first-site opportunities in Brazil and Colombia.

Years 4–5 Expand with partners capable of local delivery and maintenance, assessing platform integration against each country's conditions.

Portrait of Harold TDC EUROPE / Harold · Spain, Germany, France & Belgium

Year 1 The European five-year station plan is under way. Confirm candidate sites, electricity supply and partnership structures with landowners.

Years 2–3 Phase equipment configuration, construction delivery and regional maintenance according to site readiness.

Years 4–5 The published target is 200 charging stations within five years; actual progress depends on implementation at each site.

Portrait of Amir TDC UAE / Amir · UAE, Oman & Iran

Year 1 Work with partners in all three markets to assess vehicles, power supply, installation environments and after-sales resources.

Years 2–3 Prioritise partners with local technical support for sample evaluation and candidate-site solutions.

Years 4–5 Expand supply around validated demand, with repairs and spare parts able to support multiple sites.

Portrait of Nay TDC THAI / Nay · Thailand, Laos & Cambodia

Year 1 Build on participation in over 40 Thai projects and more than 30 platform sites to progress the planned King Kaeo company-operated station.

Years 2–3 Assess expansion through transaction, settlement and maintenance records, while developing partnerships in Laos and Cambodia.

Years 4–5 Extend Thailand's established equipment delivery and station operating practices into suitable new markets.

Portrait of MarlinTDC AFRICA / Marlin

African market discussions begin with site needs in South Africa. Available supply, vehicle demand and local installation conditions are clarified before equipment and technical cooperation are assessed.

Select a map label or region to view its development path. Europe's 200 sites are the Group's published five-year target. Regional stages indicate business direction; unannounced site counts and dates depend on project implementation.

Basemap: Natural Earth (1:110m). Colour indicates business coverage; markers show regional locations. Mexico is the TDC LATIN base; Victor and Lio coordinate cross-regional North American distribution.

TDC AMERICA

Victor · United States

High-power charging for logistics fleets is the core business. Eight completed sites in Los Angeles are shared by several logistics companies. This model pools different fleets' charging needs, with partnerships focused on return schedules, simultaneous charging demand and available power.

TDC LATIN

Lio · Mexico, Brazil & Colombia

Mexico is the regional base, with coverage extending to Brazil and Colombia. The region's largest project is a joint charging-station programme with the Mexican government, expanding access to charging and supporting Mexico's EV market.

TDC EUROPE

Harold · Spain, Germany, France & Belgium

Coverage includes Spain, Germany, France and Belgium in Western Europe. The European station programme is under way, targeting 200 sites within five years. The regional team works with landowners, fleets and equipment partners; Spanish site owners can also connect equipment to TDC Charge.

TDC UAE

Amir · UAE, Oman & Iran

The team serves distributors and station customers in the UAE, Oman and Iran. It turns site power, target vehicles and construction conditions into equipment and interface requirements, coordinates quotations with headquarters and agrees installation responsibilities and technical support before delivery.

TDC THAI

Nay · Thailand, Laos & Cambodia

The team covers Thailand, Laos and Cambodia. In Thailand, it has participated in over 40 station projects across multiple provinces, spanning equipment supply, development support and investment in company-operated stations. More than 30 Thai sites also use TDC Charge to manage charging payments.

INTERNATIONAL PRESENCE / MARKET ENGAGEMENT

Show global customers the products—and the people behind delivery

Over the past three years, TDC has exhibited in the United States, Germany and Thailand, presenting charging equipment, the app and the platform together. Customers can inspect equipment, ask about configurations and discuss applications, turning a first meeting into deeper technical and project dialogue.

International exhibition | Equipment demonstrations connect customers directly with engineering and commercial teams.
International exhibition | Equipment demonstrations connect customers directly with engineering and commercial teams.

United States · Channel and project needs

Dialogue with distributors, project developers and platform partners builds an understanding of interfaces, vehicles and station operations, creating a basis for equipment selection and solution development.

Germany · European retail and technical customers

Brand presentations and configuration discussions connect TDC with European markets, introducing charging products, platform integration and regional service arrangements.

Thailand · Demonstrations backed by local practice

Exhibition demonstrations are linked to local deployments, commissioning and training. Customers learn about both the products and what happens after arrival: who installs them, how they are used and how support is obtained.

Business discussions | Equipment demonstrations lead into applications, configurations and partnership options.
Business discussions | Equipment demonstrations lead into applications, configurations and partnership options.
Thai market engagement | Product demonstrations and local project experience address delivery and service questions.
Thai market engagement | Product demonstrations and local project experience address delivery and service questions.

One meeting can begin a long-term partnership

Exhibitions establish direct contact; digital content continues the product and project story; visits, demonstrations and local training bring discussions into practical use. TDC follows up on site, vehicle, power and service needs so cooperation rests on a clear understanding of products and responsibilities.

CHINESE EV BRANDS / GLOBAL MOMENTUM

Chinese EVs go global.
Charging becomes an everyday business.

As automotive brands take vehicles, dealerships and manufacturing overseas, charging demand follows into local communities, shopping districts and fleets. For TDC partners, the opportunity is to connect more EVs to convenient, dependable, chargeable and maintainable services—turning new vehicle sales into a growing base of recurring users.

20 million+Global electric car sales in 2025BEVs + PHEVs; around one quarter of global new car sales[1]
2.5 million+China-made EV exports in 2025Double the 2024 export volume; exports are not retail deliveries[2]
60%Share of global EV sales supplied by Chinese automakers in 2025By automaker headquarters; not the share sold within China[1]
GLOBAL SHARE / 2025

Global share: who supplies EVs?

Global electric car sales, grouped by automaker headquarters region.

60%China HQ

Chinese automakers supply around six in ten EVs sold worldwide, making them a major influence on vehicle choice and charging demand.

Select a slice or legend. European, North American and other shares are approximate; the remaining ≈10% is the residual. This covers all automakers, not the combined or individual shares of the eight brand families below.[1]
ADOPTION TREND / 2025—2035

EVs as a share of global new car sales

Distinguish actual results, full-year estimates and long-term scenarios.

Selected milestones for the EV share of global new car sales2025 actual: around 25%; 2026 full-year estimate: 29%; 2035 IEA exploratory scenario: around 50%. These are selected milestones, not an annual forecast series.02550%25%29%≈50%2025 Actual2026 Estimate2035 Scenario
Every EV sold adds to the installed vehicle base that needs ongoing charging.Planning service points along everyday routes has longer-term value than focusing only on one year's sales momentum.
The 2026 figure is the IEA's mid-year update of its full-year estimate. The ≈50% figure for 2035 comes from an exploratory scenario and is sensitive to policy and price changes. Each milestone uses its stated reporting basis; they do not form a linear annual growth forecast.[1][3]
Overseas sales of China-made EVsRegional growth signals in 2025

+130%Southeast Asia

+60%Middle East

+55%Latin America

Year-on-year versus 2024; not growth in each region's entire EV market.[2]

Eight brand families. Eight routes into overseas markets.

Annual, cumulative and regional milestones follow each brand's official disclosures. Group-wide, all-powertrain figures indicate channel scale; charging demand must be assessed against actual deliveries of BEVs and externally rechargeable vehicles.

BYD
1 million+vehicles

2025 overseas sales | New energy vehicles

Official summary: +145% year-on-year

Overseas sales exceeded 780,000 in the first half of 2026, with business across Latin America, Europe and Asia-Pacific.[4]

Charging opportunityServe new EV owners in neighbourhoods, retail districts and intercity travel.
GEELY
120,000+vehicles

2025 NEV exports | Geely Auto reporting scope

Around 420,000 overseas sales across all powertrains

The EX5 has entered more than 40 markets. Products including the EX2 and EX5 EM-i bring battery-electric and plug-in hybrid choices to more overseas customers.[5]

Charging opportunityWork with vehicle dealers and destination owners; confirm charging needs model by model.
CHERY
1.344 millionvehicles

2025 group exports | Includes combustion vehicles

Group exports: +17.4% year-on-year

Global NEV sales were around 904,000 in the same year. Existing overseas channels and an expanding NEV range offer access to customers for electrification services.[6]

Charging opportunityUse dealer networks to identify BEV and PHEV customers whose vehicles have actually been delivered.
XPENG
45,008vehicles

2025 overseas deliveries | Electric vehicles

+96% year-on-year · 60 markets at year-end

Overseas deliveries almost doubled as battery-electric models reached more countries and regions, supported by expanding sales and after-sales touchpoints.[7]

Charging opportunityPlace compatible, dependable charging services along owners' everyday routes.
AION / GAC INTERNATIONAL
130,000+vehicles

2025 GAC overseas sales | Multiple brands combined

+47% year-on-year · Includes GAC, AION and HYPTEC

GAC added 16 markets in 2025, including Brazil, Poland, Portugal and Australia. AION is expanding alongside GAC's global channel network.[8]

Charging opportunityPrioritise AION BEV owners, taxis and destination parking.
DEEPAL
1,000+vehicles

Egypt launch-period milestone | Disclosed Oct 2026

Regional example, not global overseas sales

After entering Egypt in 2025, DEEPAL quickly established an initial customer base. By 2026, its S05 and S07 BEVs were on sale in Europe.[9][10]

Charging opportunityDevelop local charging nodes alongside new sales and service networks.
GWM
540,000vehicles

Jan–Oct 2026 overseas sales | All powertrains

+38% year-on-year · Not an EV-only figure

Its overseas network exceeds 1,800 outlets. As multiple powertrains expand, charging projects should focus on battery-electric and externally rechargeable models.[11]

Charging opportunityValidate actual customer demand with ORA and relevant plug-in model channels.
MG
317,000vehicles

Cumulative European BEV deliveries to Feb 2026

Around 300,000 European sales in 2025, all powertrains

European sales in 2025 were around 30% above 2024. The accumulated BEV customer base represents an ongoing audience for charging services.[12]

Charging opportunityDevelop residential, workplace and retail charging around the existing EV owner base.
FROM VEHICLE SALES TO RECURRING DEMAND

Vehicle delivery starts a lasting charging relationship

Vehicle dealers know where customers are. Hotels and malls provide dwell time. Logistics fleets run to schedules. TDC and local partners turn those connections into site assessments, vehicle and connector checks, equipment configurations, and platform and service plans—giving growing EV demand a practical route to viable stations.

Brand sales and regional growth indicate market direction. Site selection should still reflect locally registered, delivered and actively used vehicles, matched to available power and actual dwell-time needs.

Match your resources to an application →
Data definitions and official sources

Global EV charts use the IEA electric car definition: BEVs + PHEVs. Conventional HEVs do not create external charging demand. Brand NEV figures, group exports, overseas sales and cumulative deliveries use different scopes and cannot be added to derive global shares for these eight brands. AION's 130,000+ figure is GAC's multi-brand overseas total; GWM and Chery totals include non-plug-in vehicles; DEEPAL is an Egyptian milestone; MG is cumulative European BEV delivery.

  1. IEA | Global EV Outlook 2026: sales, headquarters-based shares and 2035 scenario ↗
  2. IEA | Manufacturing and trade: 2025 Chinese EV exports and regional growth abroad ↗
  3. IEA | Electric Car Markets in a Time of Uncertainty: updated 2026 full-year share estimate ↗
  4. BYD | 28 Jul 2026: 2025 overseas performance and first-half 2026 progress ↗
  5. GEELY | Full-year 2025 sales and overseas NEV exports ↗
  6. CHERY | Official 2025 group exports and NEV sales announcement ↗
  7. XPENG | Full-year 2025 deliveries and overseas markets announcement ↗
  8. GAC | 16 Feb 2026: 2025 overseas business, brands and channels ↗
  9. DEEPAL | Changan's 26 Oct 2026 Egyptian market announcement ↗
  10. CHANGAN | 14 Oct 2026: DEEPAL models and channel development in Europe ↗
  11. GWM | 12 Nov 2026: ten-month overseas sales and global network ↗
  12. MG | 19 Feb 2026: cumulative European BEV deliveries and 2025 sales ↗

Sources checked: 22 November 2026. Long-term scenarios, annual estimates and achieved company milestones are identified separately. This page presents public market observations.

GLOBAL OPPORTUNITY / THAILAND 01 / 04

Thailand | Turning EV adoption into an enduring local charging business

As electric vehicles become more accessible and local manufacturing takes root, charging demand moves beyond a handful of demonstration sites into hotels, shopping destinations, intercity routes and fleet depots. The opportunity belongs to partners who can build dependable stations and support them throughout their operating life.

Approx. 140,000 Electric passenger cars sold in 2025 Up approximately 70% year on year; BEVs and PHEVs combined [1]
Up to THB 50,000 Purchase support for eligible vehicles, 2026–2027 EV 3.5; subject to vehicle price, battery size and programme eligibility [2]
150,000 / year Designed annual capacity of BYD's Thai plant Opened in 2024; manufacturing capacity is not vehicle sales [4]
Thailand · Southeast Asian focus market Regional overview

Room remains to expand fast charging

National DC charging points: historical baseline and policy target

Sep 2025
7,096
2030 target
12,000
The difference is 4,904 fast-charging points. This comparison illustrates a national network target, rather than TDC's outstanding orders. [3]

Policy encourages adoption; industry expands vehicle supply

Consumer support: EV 3.5 combines purchase subsidies with tax incentives. In 2026–2027, eligible battery-electric passenger cars priced at no more than THB 2 million can receive THB 50,000 of support when battery capacity is at least 50 kWh; the smaller-battery tier receives THB 25,000. Eligibility depends on the vehicle, production conditions and programme rules. Earlier import-duty concessions should not be treated as universally available today. [2]

Local manufacturing: BYD's Rayong factory is operating, and the company has outlined plans to introduce more battery-electric and plug-in hybrid models. Local manufacturing, sales and after-sales networks reinforce one another as EV use becomes part of everyday commuting and weekend travel. [4]

The opportunity for partners

Let parking time guide equipment selection: consider HAM for hotels, golf courses and shopping centres, and PDM, SPP or other suitable series for high-turnover public sites and fleets. TDC helps review electrical supply, vehicle interfaces, OCPP integration and first-site testing, with local teams taking responsibility for on-site service.

See TDC's utility integration testing →

The decade ahead: convenient locations, dependable service and repeat customers

2026–2036 · Business outlook
2026—2028 Serve the EV owners already on the road

Prioritise hotels, commercial parking and fleets with predictable return times. Validate charging frequency, customer arrivals and energy delivered per vehicle.

2029—2031 Connect cities and tourism routes

Use national fast-charging objectives and intercity travel patterns to identify accessible sites with deliverable power, while reserving space for additional connectors.

2032—2036 Turn site experience into network capability

As the vehicle fleet accumulates, competition increasingly centres on availability, platform coordination, spare-parts turnaround and a consistent experience across sites.

This is market analysis based on policy, vehicle supply and use cases. It is not a country sales forecast or a list of projects awarded to TDC. Expansion should be validated through site utilisation, grid access and partnership agreements.

Charging infrastructure needs sustained investment over the coming decade

In the IEA's 2026 Current Policies Scenario (CPS), global public charging power capacity for light-duty EVs reaches approximately six times its 2025 level by 2035. This supports the direction of long-term infrastructure investment; individual sites still need to demonstrate viable locations, traffic and electricity economics. [5]

Data definitions and sources

Passenger-car sales include battery-electric vehicles (BEVs) and plug-in hybrids (PHEVs). Conventional hybrids (HEVs) do not require external charging. DC charging points, sites and charger units are different measures. The 2035 capacity figure is a global scenario, not a forecast of Thai sales or a promise of site revenue.

  1. IEA, Global EV Outlook 2026: Thailand's 2025 electric passenger-car sales ↗
  2. Thailand BOI: EV 3.5 annual subsidies, vehicle and battery conditions ↗
  3. Thailand BOI / EV Board: September 2025 fast-charging baseline and 2030 target ↗
  4. BYD: 2024 Thai factory opening and designed annual capacity ↗
  5. IEA 2026: public charging power capacity and 2035 scenarios ↗

Sources checked on 22 November 2026. Historical results, policy targets, corporate plans and analytical scenarios are identified separately. Eligibility is governed by the current rules of the relevant local authorities.

GLOBAL OPPORTUNITY / MEXICO 02 / 04

Mexico | A growing EV fleet needs a stronger charging network

The opportunity is to connect growing vehicle demand with sites that have available power, local service and genuine use cases. Shopping centres, hotels and urban fleets can all become everyday gateways into the charging network.

>7% EV share of new-car sales in 2025 Around 2% in 2024; more than 7% in 2025 [1]
Approx. 4,000 Public charging points in 2025 Growth of less than 25% during the year [2]
85% Of 2025 EV sales were imported from China Country of import origin, not brand market share [1]
Mexico · Latin American focus market Regional overview

Vehicle growth outpaces public charging expansion

Year-on-year change in 2025; both measures refer to national stock

Electric light-duty vehicle stock >100% More than doubled in one year
Number of public charging points <25% Slower expansion of public charging
Electric light-duty vehicles per public charging point also more than doubled in 2025. The gap points to a need for network expansion and optimisation; it does not establish that every location faces queues or will be profitable. [2]

A clearer framework and expanding vehicle channels

Vehicle and charging policy: The federal new-car tax, ISAN, exempts electric vehicles meeting the statutory criteria. This does not also exempt import duty or VAT. For charging connections, the A/108/2024 framework promotes orderly, safe integration with the national electricity system. Projects must still follow current electricity rules and local permitting requirements. [3][4]

Chinese brands' expansion: Geely announced a target of 100 dealerships in Mexico in 2026 alongside a broader new-energy vehicle range. In November 2026, BYD added a further digital customer channel, with authorised dealers handling enquiries and transactions. As vehicle channels reach more consumers, nearby charging that can be used and maintained becomes increasingly important. [5][6]

The opportunity for partners

Start with existing BEV and plug-in hybrid users, and confirm charging needs with hotels, dealers and fleet operators. TDC supports vehicle and interface surveys, platform integration and local after-sales responsibilities. As import policy changes, validate a first site, phase procurement and expand against measured utilisation.

Turn local relationships into deliverable projects →

The decade ahead: fill critical gaps, then improve network efficiency

2026–2036 · Business outlook
2026—2028 Anchor demand with fleets and destinations

Begin with projects serving known vehicles or clear parking durations. Check each model's AC and DC charging capability, and exclude conventional hybrids from charging demand estimates.

2029—2031 Connect urban charging nodes

Extend reliable coverage in commercial clusters and along intercity routes. Use actual transactions, energy delivered and dwell times to decide where additional equipment is justified.

2032—2036 Make continuous service a competitive advantage

Bring electricity supply, payments, remote diagnostics and on-site repairs into one operating process, supporting fleet renewals and repeat deployments across commercial properties.

This is market analysis based on policy, vehicle supply and use cases. It is not a country sales forecast or a list of projects awarded to TDC. Expansion should be validated through site utilisation, grid access and partnership agreements.

Data definitions and sources

Dealership networks serve multiple powertrain types. The 100-dealer figure is a corporate target, not a count of operating EV-only stores. EV growth includes BEVs and PHEVs; PHEVs may rely more on home charging, so vehicle sales cannot all be equated with public fast-charging demand. Recheck taxes, the responsible regulator and connection procedures at project initiation.

  1. IEA 2026: Mexico's new-car sales, manufacturing origin and import-policy changes ↗
  2. IEA 2026: Mexico's electric light-duty vehicle stock and public charging points ↗
  3. Mexico's Federal Official Gazette, 28 Dec 2025: ISAN EV exemption reporting categories, referring to Article 8(IV) ↗
  4. Mexico's energy regulator: announcement of the A/108/2024 electromobility connection framework ↗
  5. Geely Mexico: 2026 model and 100-dealer targets announced at the end of 2025 ↗
  6. BYD México: digital customer-channel announcement, 20 Nov 2026 ↗

Sources checked on 22 November 2026. Historical results, policy targets, corporate plans and analytical scenarios are identified separately. Eligibility is governed by the current rules of the relevant local authorities.

GLOBAL OPPORTUNITY / EUROPEAN UNION 03 / 04

European Union | Electrification creates lasting infrastructure demand with clear standards

Vehicle-emissions policy, consumer support and cross-border charging rules are shaping the market together. For partners, the opportunity extends from new sites to payments, metering, platform integration and long-term maintenance.

26.8% Plug-in share of EU new-car sales in 2025 BEV 17.4% + PHEV 9.4%[1]
60 km Charging-pool spacing on the TEN-T core network In each direction of travel; subject to applicable AFIR provisions [2]
3.1–3.5 million EU public charging points in 2035 scenarios IEA STEPS and CPS projections, not an existing count [3]
European Union · Member-state markets Regional overview

Public charging: 2030 and 2035 scenarios

EU public charging-point stock; millions

2030 · CPS
Approx. 2.0
2035 · STEPS
Approx. 3.1
2035 · CPS
Approx. 3.5
These policy scenarios are calculated separately and do not form a single growth curve. CPS means Current Policies Scenario; STEPS means Stated Policies Scenario. [3]

Policy drives demand; implementation remains country-specific

At EU level: AFIR sets minimum total output for light-duty charging pools on the core road network: 400 kW in 2025 and 600 kW in 2027. These requirements apply to the pool's combined output; individual equipment must be assessed against the specific configuration and provisions. Convenient payment and transparent pricing are also important elements of public charging. [2]

A member-state example: Germany's 2026 EV support programme offers a EUR 3,000 base subsidy for eligible private purchases or leases of new battery-electric cars, rising to EUR 6,000 depending on income and family circumstances. Member-state measures differ; Germany's amounts are not an EU-wide subsidy. [4]

Chinese brands' localisation: In 2025, BYD announced a European headquarters and R&D centre in Hungary, with the Szeged passenger-car plant forming part of its European footprint. Expanded local sales, certification and service networks create more opportunities to connect customers with charging and compatibility testing. [5]

The opportunity for partners

Prioritise shopping centres, hotels, fleets and expansion projects with established operators. TDC and regional partners first clarify vehicles, grid connections, metering, payment and local compliance documentation, then agree hardware and platform solutions. Reliable delivery and clear repair responsibilities support repeat projects across sites.

See our European channel experience →

The decade ahead: new sites, upgrades and fleet charging develop together

2026–2036 · Business outlook
2026—2028 Deliver a compliant first site

For core routes and destination charging, verify grid capacity, payment experience and acceptance requirements first, then prepare the documentation required in each country.

2029—2031 Broaden urban and corridor coverage

Let operating data guide expansion. Fleet and logistics projects should coordinate vehicle deliveries with electrical-upgrade lead times.

2032—2036 Progress from equipment supply to lifecycle service

Under the 2035 public-network scenarios, spare parts, repairs, software compatibility and equipment upgrades can create continuing business alongside new construction.

This is market analysis based on policy, vehicle supply and use cases. It is not a country sales forecast or a list of projects awarded to TDC. Expansion should be validated through site utilisation, grid access and partnership agreements.

Data definitions and sources

The 26.8% figure is 17.4% plus 9.4%. Conventional HEVs are counted separately and are not plug-in vehicles. The EU is not the whole of Europe; UK and Norwegian figures are excluded here. AFIR allows adjustments for low-traffic routes and other specified cases, with implementation by member states. Corporate facilities are described at their announced status, without implying that all are in production.

  1. ACEA: EU new-car registrations and BEV/PHEV shares in 2025, published 27 Jan 2026 ↗
  2. Regulation (EU) 2023/1804, consolidated text: charging coverage, output and payment requirements ↗
  3. IEA 2026: EU public charging scenarios for 2030 and 2035 ↗
  4. German Federal Environment Ministry: 2026 EV support and income/family conditions ↗
  5. BYD: Hungary headquarters, R&D and production footprint announcement, 15 May 2025 ↗

Sources checked on 22 November 2026. Historical results, policy targets, corporate plans and analytical scenarios are identified separately. Eligibility is governed by the current rules of the relevant local authorities.

GLOBAL OPPORTUNITY / MIDDLE EAST 04 / 04

Middle East | Building on the UAE and Saudi Arabia to serve new charging demand

Markets across the Middle East are at different stages. Urban EV use is growing in the UAE, while Saudi Arabia is developing its market through national infrastructure plans. Both need partners who can adapt to local conditions and provide lasting service.

47,944 EVs in Dubai at the end of 2025 Up 27.9% from the end of 2024 [1]
2,826 Dubai charging points at the end of Q3 2026 Includes DEWA and independent operators licensed by DEWA [2]
>5,000 Fast chargers in Saudi EVIQ's 2030 plan Across more than 1,000 locations; planned, not completed [4]
UAE & Saudi Arabia · Middle Eastern focus markets Regional overview

Dubai: more EVs are already on the road

EV stock in Dubai, not the whole of the UAE

End of 2024
37,486
End of 2025
47,944
A net increase of 10,458 vehicles in one year. Commercial opportunities must be translated into specific residential, hotel, retail and intensively used fleet locations. [1]

Different policy routes build confidence in EV ownership

United Arab Emirates: Dubai targets electric or hybrid vehicles accounting for 30% of government vehicle procurement by 2030. DEWA also allows eligible independent charging operators to apply for licences, encouraging private investment in wider coverage. Conventional hybrids included in procurement targets do not directly create plug-in charging demand. [2][3]

Saudi Arabia: PIF and Saudi Electricity Company established EVIQ and announced plans for more than 5,000 fast chargers across over 1,000 locations by 2030. Wider road and destination coverage is intended to reduce concerns about intercity EV travel. [4]

Chinese brands' regional growth: BYD's Saudi network announced 10 operating showrooms in 2026, with new locations combining sales, service and spare parts. Brand expansion and the introduction of BEV and PHEV models make charging provision increasingly relevant to dealers, hotels and commercial property owners. [5]

The opportunity for partners

Translate local conditions into engineering requirements: verify sustained output in high temperatures, equipment cooling and maintenance arrangements, then test vehicles, the platform and payment flows. TDC and local partners agree suitable configurations, on-site responsibilities and spare-parts plans, prioritising hotels, commercial properties and fleets with demonstrable demand.

See the long-term service process →

The decade ahead: urban density and intercity coverage develop in parallel

2026–2036 · Business outlook
2026—2028 Start with urban sites that have real demand

Validate property and fleet demand in the UAE. In Saudi Arabia, work with dealers and major-city partners to identify a feasible first site.

2029—2031 Align with local network expansion

Coordinate projects with Saudi Arabia's 2030 plans and each city's electricity conditions. Reserve expansion capacity while developing repair and spare-parts coverage across cities.

2032—2036 Earn repeat business through operating quality

As vehicles and networks mature, sustained output, performance in hot climates, payment experience and service coverage will shape a partner's ability to take on more sites.

This is market analysis based on policy, vehicle supply and use cases. It is not a country sales forecast or a list of projects awarded to TDC. Expansion should be validated through site utilisation, grid access and partnership agreements.

Data definitions and sources

Dubai's figures do not represent the UAE as a whole or the entire Middle East. Saudi plans are not completed installations. The organisations and automakers cited are included for market analysis, not as evidence of TDC procurement, authorisation or financing relationships. Purchase incentives, operating licences and equipment compliance must be verified country by country.

  1. DEWA: Dubai EV stock at the end of 2024 and 2025 ↗
  2. DEWA: 2,826 charging points at end-Q3 2026 and private CPO participation ↗
  3. UAE Government: national EV policy, Dubai government procurement targets and local frameworks ↗
  4. PIF: EVIQ launch and the 2030 fast-charging network plan ↗
  5. Al-Futtaim BYD Saudi Arabia: 2026 Riyadh and Al-Qassim showroom expansion ↗

Sources checked on 22 November 2026. Historical results, policy targets, corporate plans and analytical scenarios are identified separately. Eligibility is governed by the current rules of the relevant local authorities.

EUROPEAN RETAIL / JD.COM & JOYBUY

Bringing TDC into everyday life in Europe

TDC has an ongoing procurement partnership with JD.com's Joybuy, supplying TDC-branded AC and portable charging products through European retail channels. From specifications and local-language instructions to replenishment and after-sales support, channel development centres on the consumer's actual experience.

JD.com logoJoybuy logo
Standardised products · Multiple languages · Ongoing channel support

Supply established in Germany, the Netherlands and France; UK channel development continues.

01 / PRODUCT RANGE

A clear product range for different needs

Standard specifications, product content and instructions for models including RAC11, RAC22, SNK03 and SNK07 help each market present products accurately and guide suitable selection.

02 / LOCAL EXPERIENCE

Localisation in every detail of use

Language, packaging, installation and operating instructions are adapted to each market, with applicable requirements and after-sales arrangements confirmed. Clear information supports consumers from discovery to first use.

03 / CHANNEL CONTINUITY

Beyond one delivery, towards ongoing service

Product mix and replenishment schedules are coordinated with the channel, supported by batch tracking and maintained after-sales information, connecting content, supply and support for long-term channel development.

Models, listings and availability in each European market follow actual channel arrangements. Logos identify the channel relationships described on this page.

Utility Partnership Track Record

Charging equipment supplier to utilities in multiple countries

TDC has worked with local utilities in multiple countries. According to Group project records, its in-house charging equipment has passed utility project tests and been procured for projects. As one of the equipment suppliers, TDC has also worked with local engineering partners to participate in and complete new-energy charging projects. This recognition is reflected in specific models, supply batches and sites in operation.

Thai project | Three chargers, site power infrastructure and PEA VOLTA service signage shown together.
Thai project | Three chargers, site power infrastructure and PEA VOLTA service signage shown together.

Thailand | From PEA joint testing to volume delivery

Cooperation with Thailand's Provincial Electricity Authority (PEA) covers two key stages. On the technical side, TDC's team enters the PEA laboratory for project testing. On the supply side, the first round of the Chiang Mai project has completed delivery of 30 charging units. Another operational commercial example is the 240 kW dual-connector fast-charging station at Robinson Lifestyle in Prachin Buri.

EU markets and Colombia | Overseas projects using the same product line

PDM240 has been used in charging projects in EU markets and Colombia. International distributors can begin selection with equipment already deployed, then define testing around local vehicles, platforms and utility requirements. Regional teams can provide the relevant country- and model-specific supply and delivery records during project discussions.

In-house Commissioning

Before shipping, connect equipment and platform through a charging session

TDC laboratory | Engineers operate the charger touchscreen while colleagues monitor the process on computers.
TDC laboratory | Engineers operate the charger touchscreen while colleagues monitor the process on computers.

When a driver presses Start, what appears on the charger—and does the back office see the same connector begin supplying power? The two views must match for accurate billing. TDC brings equipment, vehicles and the platform into one commissioning environment so engineers can reproduce field issues.

Check the whole system through one transaction

A session can be checked step by step for connector ID, start time, energy and stop status. If an anomaly appears, comparing charger displays with platform records narrows the cause before retesting under the same conditions.

For procurement and distributor teams

Agree acceptance scenarios before the first shipment. Public sites focus on complete transactions; fleets can include specific vehicles and shift requirements. Both sides can then accept subsequent batches against the same conditions.

After delivery, TDC continues equipment inspections, troubleshooting and local technical training, while developing links between service records, serial numbers, versions and tickets. Pre-delivery testing, on-site commissioning, operator training, fault classification, spare-part replacement and follow-up are progressively shaped into a traceable, repeatable support process.

PEA Joint Testing

At the PEA laboratory, follow a charging session from start to finish

PEA laboratory, Thailand | The team jointly tests an OCPP project with a vehicle, charger and computers.
PEA laboratory, Thailand | The team jointly tests an OCPP project with a vehicle, charger and computers.

A driver has unplugged and left, but the platform still shows “Charging”. Even when energy was delivered, the operator must answer two questions: what should this session cost, and can the next driver use the connector? This is why project-level joint testing is needed before equipment connects to a utility's platform.

One action. Records at both ends.

OCPP is the communication protocol between chargers and platforms. TDC and PEA jointly test vehicles and equipment in the laboratory. When a driver ends a session, for example, the charger should record stop time and accumulated energy; the platform must match those details to the same connector and transaction and update bay availability.

Give the utility and equipment teams a shared view of the issue

Both teams first agree actions and expected results. If displays differ, equipment engineers locate charger messages by time while platform staff check received data and processing results. They agree which side needs adjustment, then repeat the same scenario until both reach a consistent conclusion.

What does passing joint testing mean for the owner?

Buyers can verify whether a particular equipment model, software version and platform work together, while stations gain reusable acceptance scenarios. If the platform or version changes, affected functions can be rechecked, giving opening schedules and maintenance a clear technical basis.

Station Delivery

On opening day, help the first driver find a connector and start charging

Robinson Lifestyle opening, Prachin Buri, Thailand | The banner shows TDC, PEA VOLTA CONNEXT, 240 kW and a dual-connector configuration.
Robinson Lifestyle opening, Prachin Buri, Thailand | The banner shows TDC, PEA VOLTA CONNEXT, 240 kW and a dual-connector configuration.

This opening photo brings the partnership's result into one frame: TDC PDM240 equipment behind the team and the shopping centre's charging service presented to drivers in front. From selection to public opening, TDC and local partners deliver usable fast-charging equipment to the site owner.

Turn delivered equipment into usable charging bays

Shopping centres coordinate construction and customer movement; equipment teams coordinate arrival, connectivity and test charging. At handover, the owner can check connector IDs, instructions and tariff settings bay by bay, then follow one complete transaction.

For landowners and investors

Set energisation, platform joint testing and on-site handover as separate opening milestones. Progress becomes practical: which connector works today, and who confirms that the transaction has been received?

Multi-bay site | Installed equipment, marked charging bays and the on-site team.
Multi-bay site | Installed equipment, marked charging bays and the on-site team.
Roadside charging bays | Equipment, distribution cabinet, bollards and vehicle parking positions.
Roadside charging bays | Equipment, distribution cabinet, bollards and vehicle parking positions.
Distributor Training

Equip local distributors to deliver the first site—with factory support for the next

Local distributor engineering training | TDC explains equipment construction and field service responsibilities beside the equipment.
Local distributor engineering training | TDC explains equipment construction and field service responsibilities beside the equipment.

Distributors often need factory support most just before opening their first site or when a driver first calls about a fault. TDC trains beside the equipment so local teams can operate it themselves and know which issues they can confirm locally and which records to send to factory engineers.

Start with a driver's question. Practise the handover between two teams.

“I've plugged in, but charging never starts.” Trainees first identify the site, connector and time, record screen messages, and ask the platform team to check the same period. If the cause remains unclear, factory engineers continue from that timeline. One report to the local contact gives both teams a common starting point.

Four forms of support, from presales to service restoration

Presales selection

Bring vehicle types, dwell times, site photos and supply conditions to the selection meeting. Regional teams compare equipment and connector layouts so distributors can explain the reasons behind each option.

First-site coaching

Rehearse a complete session on real equipment. Local engineers operate it while TDC helps check connector IDs, platform status and transaction results, familiarising the team with opening acceptance checks.

Advanced troubleshooting

The local team supplies equipment IDs, fault times and symptoms. Factory engineers compare charger and platform records to assess whether communication, settings or equipment are involved, then agree field responsibilities.

Restoration and knowledge transfer

After resolution, repeat the original fault scenario and verify equipment status and transaction records. Document the solution and applicable models so the next site has a reference if the same issue arises.

NAKHON PATHOM / THAILAND

Nakhon Pathom, Thailand: one station, two customer groups

The equipment list for Phra Prathon, Nakhon Pathom includes six PDM240 units and one TRS360. Passenger-car drivers want easy access and convenient connectors; commercial vehicles also need space for length, turning and departure schedules. All influence bay and equipment layouts.

From the full site to the way passenger and commercial vehicles actually stop, project experience brings equipment selection and site circulation into the same discussion. Explore the Thai deployment portfolio →

THAILAND / DEPLOYMENT PORTFOLIO

Building local service capability through real deployments in Thailand

TDC operates in Thailand as TDC ENERGY CO., LTD., participating in charging infrastructure deployment and service. From destination charging to multi-bay DC fast charging, equipment and field experience form a foundation for installation, maintenance, spare parts and platform support.

Thai project | Charging equipment, vehicles and site circulation form a real operating environment.
Thai project | Charging equipment, vehicles and site circulation form a real operating environment.
October 2026 · Selected equipment deployment list
32 units

Listed equipment

14 groups

Address groups

9 areas

Geographic coverage

Four equipment types for different charging needs

HAM30 14 units
PDM240 15 units
FLY11 2 units
TRS360 1 unit

The list covers Bangkok and eight provinces, reaching central, southern and northeastern markets. TDC links equipment selection, commissioning and ongoing support to give regional expansion a practical service foundation.

Scope: 18 listed equipment records, grouped into 14 addresses by address text—not a cadastral- or GPS-verified total of stations. The list includes customer projects and company-invested arrangements; it does not imply that TDC owns every site. Equipment and address counts here are distinct from the Group's cumulative project participation figures.

TDC CHARGE / CONNECTED OPERATIONS

Connecting equipment, operating platforms and local teams

After equipment arrives, drivers need smooth charging, operators need visibility and engineers need timely fault diagnosis. TDC develops its own charging app and maintenance platform and organises overseas installation and after-sales training, extending delivery into everyday use.

TDC Charge app and platform illustration | Displayed figures are demonstrations, not company operating data. Functions depend on the demonstrated version and project configuration.
TDC Charge app and platform illustration | Displayed figures are demonstrations, not company operating data. Functions depend on the demonstrated version and project configuration.

Driver access

TDC Charge supports charger discovery, session start and the user experience. Interfaces, versions and service arrangements are confirmed around real operating workflows.

Operational visibility

Online status, alerts, remote diagnostics, tickets and firmware management help operators understand equipment conditions and give support teams a common information base.

Open integration

OCPP versions, equipment models, firmware and platform requirements are checked project by project before interoperability testing and acceptance, supporting the platform that fits each customer's business.

Local support

Installation guidance, basic fault handling, training and spare-part coordination connect remote engineering support with local service teams. Responsibilities are defined by the cooperation arrangements.

From connected equipment to systems working together

Platform interoperability is an important delivery step. Spanish project arrangements include Monta integration, remote monitoring and training, with testing and acceptance implemented per project. TDC connects the platform and field teams through real workflows and equipment data, helping everyone address the same equipment and issue.

Platform development directions include BOX battery state and energy dispatch, SPP power pools and terminal mapping, DLC media content management, and MET task location and recharge scheduling. Functions are developed and accepted in phases by product version.

APPLICATION SCENARIOS / FIND YOUR NEXT PROJECT

Turn the resources you have
into your next charging station.

Hotel and retail connections can open destination charging opportunities. Fleet and car park relationships can lead to high-turnover fast charging. Event, rescue and remote-site contacts can create storage-plus-charging and temporary power projects. Start with how customers park and use energy, then organise equipment, sites and service into a practical business.

What resources can you bring?

Select a resource to see how to start the conversation.
Destination charging for longer stays

Turn guest parking time into a new service

Start with hotel managers, commercial property teams or car park operators. Confirm dwell time, driver demand and available power before comparing AC and compact DC configurations.

A conversation starter:“How long do your guests usually stay? We can assess which parking spaces could support a paid charging service.”

Bring back three facts from the first meeting
  • Typical daily dwell time and driver profile
  • Available bays, power and property conditions
  • Preferred model: self-operation, lease or joint operation
View the matching solution ↓
01 / FLEXIBLE ENERGY

Power is not yet in place?
Bring energy capability to the site.

Containerised storage + charging / Integrated energy solution

Illustration of TDC BOX storage-plus-charging equipmentBOX Storage + Charging Series
Emergency & RescueLarge Outdoor EventsRemote Mines / Crypto Mining
Who could become a customer?
Rescue and emergency contractors, event organisers, equipment rental companies, mine operators and energy engineering firms.
How to shape the project
Build an energy budget around location, duration, peak power and daily energy. Confirm recharging sources, transport and deployment conditions.
How to build the business
Discuss equipment supply, task-based rental, temporary charging services or phased power support under the agreed scope.
Selection priorities: kW + kWh + recharge source

Storage capacity determines how long energy can be supplied. Continuous high-load mining or work sites need more than an output-power figure: sustainable replenishment, usable energy and deployment conditions must align. MET mobile equipment can also be considered for mobile rescue.

Explore storage + charging equipment →
02 / HIGH-UTILISATION CHARGING

Vehicles arrive together.
Make peak charging part of your capacity.

Integrated DC fast chargers / Split charging clusters

Illustration of a TDC PDM integrated DC chargerPDM · SPP Series Solutions
High-turnover Public ParkingElectric Truck & Logistics FleetsMain-road Service Areas
Who could become a customer?
Car park operators, fleet owners and dispatch managers, industrial parks, road service areas and energy station owners.
How to shape the project
Work backwards from hourly arrivals, return-to-base schedules, energy per vehicle and simultaneous demand to define equipment, charging bays and the overall electrical supply.
How to build the business
Public stations can charge drivers for use; fleets can agree charging service contracts; multi-site clients can expand using delivery and operating data.
Selection priorities: peak arrivals + available power

Integrated units can form independent service points. Charging clusters can combine multiple dispensers and power scheduling. Shared power, vehicle acceptance and peak arrivals all affect the throughput model.

Explore DC and charging-cluster products →
03 / DESTINATION CHARGING

Vehicles stay longer.
Give existing parking a new service.

AC chargers / Compact DC chargers

Illustration of a TDC FLY AC chargerIllustration of a TDC HAM compact DC chargerFLY · HAM Series Solutions
Residential CommunitiesHotels / Golf ClubsOffices / Shopping Centres
Who could become a customer?
Property managers, hotel owners, commercial asset managers, and parking operators at offices and shopping centres.
How to shape the project
Compare AC and compact DC over dwell windows of several hours or overnight, taking account of vehicle charging capability, bay-level power and load management.
How to build the business
Combine charging with hotel, workplace, residential or shopping parking, using agreed self-operated fees, site leasing or joint operation.
Selection priorities: dwell time + safe deployment

Longer stays can support lower-power charging. For underground or enclosed parking, fire protection, ventilation, protective devices and installation positions must be assessed against local requirements and property conditions.

Explore AC and compact DC products →
SAME ENERGY / DIFFERENT DWELL TIME

The same 20 kWh: dwell time changes the choice.

Help customers understand dwell time before discussing equipment power.

Illustrative continuous effective output; time = energy ÷ power.
AC · 7 kW≈2 h 51 min
Compact DC · 30 kW≈40 min
DC · 120 kW≈10 min

Theoretical example excludes charging losses, setup and vehicle changeover. Actual output depends on the onboard charger, DC acceptance, state of charge, temperature, shared power and site supply. Powers shown are examples, not fixed specifications for each entire series.

Turn one business connection into an assessable project brief

Bring TDC the site location, vehicle and connector types, dwell time, estimated daily energy, available power and preferred cooperation model. Together, we can organise equipment, platforms and delivery services to turn local resources into a concrete project.

SiteVehiclesDwell TimeEnergyPower SupplyCooperation Model
Bring a scenario. Start a conversation with TDC. →
Application and engineering basis

Images illustrate the product families. Actual connectors, power, storage capacity, off-grid/on-grid functions and supply status must be confirmed for the specific configuration and product page. Storage recharge methods must match the equipment and engineering design. Local professionals must address electrical, fire and permitting requirements for continuous mining loads, temporary power and indoor or underground parking.

Planning principles refer to the U.S. Department of Energy's AFDC: workplaces and multifamily housing can consider AC charging, while public sites may combine AC and DC. Early coordination with utilities, construction, permitting and maintenance is important. Each country follows its own local requirements.

AFDC | Charging infrastructure procurement and installation planning ↗ · AFDC | Charging site and parking structure safety considerations ↗

TDC ENERGY / PRODUCT PORTFOLIO

Choose the charger for the time vehicles spend parked

From overnight home charging and public stations to concentrated fast charging between fleet shifts, selection starts with when vehicles arrive, how long they stay and how much power the site can supply.

Products are presented by series. Power, storage capacity, connectors and terminal formats depend on the selected configuration; displayed specifications are planning references.

FLY | Connected-cable view
Connected-cable view
FLY | Front controls
Front controls
AC Charger

FLY

From home bays to public car parks, turn parked time into charging time

At home, drivers can charge overnight for the next day's journey. At hotels, shopping centres and public car parks, owners can use FLY to offer paid AC charging to the public. Vehicles recharge in existing bays while guests stay or customers shop.

7–22 kW AC output reference · Select by configuration
Residential installation and public charging operations

FLY is TDC's best-selling AC series, sold through multiple international e-commerce platforms. It has been selected for US taxi-bay projects and is also used for residential installations by distributor partners in the EU, Thailand and Hong Kong.

HAM | Front view
Front view
HAM | Side view
Side view
HAM | Three-quarter view
Three-quarter view
Destination DC Charger

HAM

A round of golf. A meal. Energy for the next journey.

At hotels, golf courses and shopping centres, vehicles often remain parked for half an hour or longer. A HAM configured for 30 kW DC could deliver about 15 kWh in half an hour at sustained full output; actual energy depends on the vehicle, battery condition and site conditions.

30 kW Shown configuration · DC output · OCPP support
Make the car park another service for your business

HAM exchanges equipment status and charging records with the operating platform through OCPP, helping operators understand bay use. While vehicles charge, customers can dine or shop, giving merchants an opportunity to attract visits alongside charging-service revenue.

PDM | Dual-connector front view
Dual-connector front view
Dual-Connector DC Fast Charger

PDM

Two adjacent bays, one fast-charging unit

PDM uses an integrated DC fast-charging design. A dual-connector configuration serves adjacent bays as one service unit. Operators select power and equipment quantities around traffic, vehicle requirements and site supply; three dual-connector units, for example, can support a six-bay layout.

240 kW Shown configuration · Total DC output
Public fast charging and fleet en-route charging

PDM is a major, best-selling TDC-developed product, deployed in projects across the EU, Thailand and Colombia. TDC project records indicate participation by local electricity organisations in testing and procurement.

DLC | 43-inch commercial display and charging controls
43-inch commercial display and charging controls
2027 | DC Fast Charging with Advertising Display

DLC

One commercial parking bay can sell charging and advertising time

A 43-inch UV-resistant HD commercial display turns driver-facing charging equipment into media space merchants can book. Supermarkets can promote daily offers, hotels can present dining services, and site owners can sell screen time to nearby brands.

240 kW Shown configuration · DC output
Supermarkets, shopping centres and hotels

Charging income is estimated from actual energy sold. Advertising can be priced separately by campaign period, play frequency and available time slots, making the two revenue sources clear to the commercial team.

SPP | Liquid-cooled dual-connector dispenser
Liquid-cooled dual-connector dispenser
SPP | Air-cooled dual-connector dispenser
Air-cooled dual-connector dispenser
2027 | Split Charging System

SPP

As vehicles arrive, allocate power to demand

The power cabinet and bay-side dispensers are configured separately. Fleets position dual-connector dispensers around vehicle circulation, while the cabinet allocates output according to vehicle demand and available power, serving different vehicles and departure shifts.

480 kW Shown configuration · Power cabinet rating
Large public sites and logistics fleet depots

Air- and liquid-cooled dispensers can be selected by usage intensity. The cabinet shown is configured for 480 kW; output per connector during simultaneous charging depends on system configuration and power allocation.

BOX | Storage-and-charging unit, front/side view
Storage-and-charging unit, front/side view
BOX | Integrated enclosure side view
Integrated enclosure side view
2027 | Energy Storage Fast-Charging Station

BOX

Store energy first. Deliver it when traffic peaks.

In the configuration shown, 522 kWh is storage capacity and 400 kW is charging output. Together, they help assess peak fast-charging capability and how much off-peak time is available to recharge the storage system.

522 kWh Shown configuration · Storage capacity
Concentrated arrivals and integrated storage-and-charging sites

TDC has signed a partnership with an EU business to start a five-year programme targeting 200 charging sites, using storage-and-charging configurations from the BOX series. The 200 sites are a deployment target.

MET | Charging interface
Charging interface
MET | Unit exterior
Unit exterior
MET | Side exterior
Side exterior
MET | Screen view
Screen view
2027 | Mobile Charging Unit

MET

Bring fast charging to the vehicle that needs it

The series can be configured with up to 200 kWh of storage for sites awaiting fixed power, short-term events or vehicles needing on-site charging. Operators can dispatch equipment by location and service period.

160 kW Charging output
200 kWh Storage battery (maximum configuration)
Emergency support, outdoor events and temporary car parks

Event organisers can include temporary charging in site services; rescue teams can dispatch energy by task. Schedules should allow time to return for recharging, with each trip's service volume based on actual usable capacity.

PRODUCT ROADMAP / 2026–2031

Four application areas. The next phase of product development.

Building on existing AC/DC products and channels, TDC is phasing development across storage-and-charging, high-power multi-bay systems, commercial media and mobile energy. Products, platforms and regional service advance together to make new solutions progressively repeatable across markets.

Product series 2026
Introduction & preparation
2027
Priority launches
2028–2029
Application replication
2030
Deeper service
2031
Continuous iteration
BOX
Storage & charging · Priority focus
Project introduction Priority promotion Regional replication Deeper service Product updates
SPP
High-power, multiple bays
Specifications & testing Flagship promotion Multi-site solutions Platform development Product updates
DLC
Charging & commercial media
Upgrade development Planned public release Commercial applications Media services Product updates
MET
Mobile energy service
R&D integration Planned public release Application rollout Dispatch services Product updates
PRODUCT READINESS

Confirm the product and its application first

Configuration finalisation, test information, applicable requirements and platform interoperability establish what the equipment supports before regional promotion and delivery.

REPEATABLE DELIVERY

Turn first-site experience into multi-site capability

Commissioning, acceptance feedback and regional training refine solutions so equipment, platforms, spare parts and local teams can support subsequent deployments together.

LIFECYCLE SUPPORT

Keep product development aligned with long-term use

Strengthen software, maintenance, spare parts and lifecycle management, updating products as markets evolve to provide continuity of support.

This series-level roadmap reflects development directions in the October 2026 materials. Future milestones are plans, not completed results. Series may contain different versions and configurations; release timing, power, capacity, specifications and regional supply remain subject to product finalisation and project confirmation.

TRADE & DISTRIBUTION

The confidence to grow locally. The capability to deliver.

You bring local customers, channels and engineering resources. TDC contributes products, technical expertise and factory support. Together, we turn a sales lead into a project with a justified configuration, clear engineering responsibilities and an operating team ready to take over, making the first site a dependable foundation for the next.

Your local strengths Customer insight · Site knowledge · Local service
TDC's support Product solutions · Platform collaboration · Factory expertise
01 Qualify the opportunity
02 Specify the right equipment
03 Deliver the first site
04 Establish local service
05 Replicate successful projects

Focus your customer development

Start with the customer group you know best: hotels, shopping centres, golf courses, fleets or public charging operators. TDC works with you to understand dwell times, charging requirements and site conditions, supporting discussions with product information, case demonstrations and a clear explanation of the proposed configuration.

Build credible specifications and quotations

Gather vehicle models, connectors, available power, peak arrivals and budget, then compare chargers, connectors and phased deployment options. TDC helps explain rated output, dual-connector sharing and actual vehicle acceptance rates. Local engineers verify transformers, cables, construction and grid requirements to align the sales promise with delivery.

Advance projects with the right documentation

Compile specifications, interface details and test documentation for the applicable model, and agree platform integration and acceptance tests. For tenders, local registrations or third-party certification, identify the required documents and owners. Existing reports must cover the actual model, configuration and local requirements.

Deliver the first site as a coordinated team

Confirm the equipment list, construction boundaries, installation conditions and test plan before integration begins. Verify start, charging, stop, metering, payment and back-office transactions, so the distributor can show the customer tangible evidence that the site meets its opening requirements.

Local after-sales backed by factory collaboration

Local teams handle initial on-site checks and customer communication. TDC supports remote diagnosis using equipment IDs, logs, alarms and transaction times, coordinating replacement parts and retesting where needed. Training, technical resources and commonly used spares are arranged by regional project, making issues traceable and restoration verifiable.

Develop a continuing business relationship

Beyond equipment sales, partners may provide installation coordination, inspections, maintenance, platform operations and network expansion, subject to local qualifications and agreement. Use first-site delivery and operating records to earn repeat business. Territory, discounts, service fees and warranty scope are defined in the partnership agreement.

Three teams. One connected service chain.

Local frontline Customer intake, site checks, inspections and qualified repairs

TDC technical collaboration Selection review, log analysis, platform integration and resolution advice

Further factory support Complex fault analysis, suitable parts and version solutions, and retesting support

Response hours, attendance arrangements, spare-parts stock, charges and escalation routes are agreed in the cooperation plan. Work is carried out by personnel qualified under local requirements.

Give customers deliverables they can verify

  • A configuration proposal matched to the site, vehicles and budget
  • A responsibility matrix covering supply, construction, platform and acceptance
  • Traceable charging and transaction test records
  • Local contacts, warranty terms and spare-parts arrangements
  • Inspection and troubleshooting experience that can be reused at the next site

Our partnership objective: Help you develop from introducing equipment into a local charging-service partner customers want to work with over the long term.

Bring a customer requirement. Start your first-site proposal. ↗
LAND PARTNERS

Give a well-positioned property another income stream and another reason to visit

A site's charging value comes from location, available power and real vehicle demand working together. TDC, landowners and local partners consider layout, equipment, platform integration and service as one plan, creating the opportunity to turn drivers' dwell time into rental income, charging revenue and spending at nearby businesses.

Property income value

A site with a long-term agreement and stable net rent can establish a clearer income record. Better income can support valuation discussions; the land's market value still requires an independent assessment.

Charging operating income

Owner-operators receive net charging income, landlords receive rent, and joint investors share distributable cash under their agreement. Establish who receives which income before allocating investment and risk.

Commercial visitor value

Connect charging bays with food, retail, toilets and safe walking routes. Give customers somewhere to eat and shop while charging, then verify the effect through offer redemptions and spending records.

Published research · Not a TDC earnings guarantee

Charging and nearby businesses can reinforce each other

A California study published in Nature Communications analysed more than 4,000 charging stations and around 140,000 businesses. From January 2021 to June 2023, spending at businesses within 100 metres of a charging station increased by an average of approximately 3.2%. This supports the case for planning charging alongside commercial activity. It does not imply equivalent increases in landlord rent, merchant profit or land prices across countries. [1]

BEFORE / AFTER · Adjustable landlord income illustration

One property: how can additional net rent affect an income-based value?

Assume the operator funds the charging equipment, while the landlord retains existing net rent and receives additional net rent from the charging area. Figures are in Thai baht and can be adjusted to the actual site.

Before 20,000 Monthly net rent 3,000,000 Illustrative income-based value
After 35,000 Monthly net rent 5,250,000 Illustrative income-based value
Additional annual net rent 180,000 Illustrative value difference 2,250,000 Change at the same capitalisation rate +75.0%

Calculation basis: Illustrative value = annualised property net rent ÷ assumed capitalisation rate. Additional net rent is assumed to be after displaced parking income and the landlord's additional expenses. The 8% rate is an educational input, not a local market valuation rate. Vacancy, lease-term discounting, taxes and capital expenditure are excluded; direct capitalisation is unsuitable without a stable lease. Actual land prices, collateral values and investment returns require separate assessment. The value difference is not realised income. Owner-operated charging profit must not be added again to this rental scenario.

Choose a partnership model that fits your resources and objectives

Partnership model What the landowner receives Terms to agree first
Lease the land Fixed or agreed escalating rent under contract, with the operator investing in and managing the site as agreed. Lease term, electricity account holder, access, minimum rent, end-of-term ownership and reinstatement obligations.
Owner-funded, owner-operated Equipment ownership and operating responsibility as agreed, with income after electricity, service and operating costs. Total investment, grid-connection lead time, actual energy demand, peak-demand charges, financing and maintenance budgets.
Joint investment Contribute land-use rights and/or capital, sharing distributable cash and risk under the agreement. Land-use rights valuation, contribution ratios, distribution definitions, additional funding and exit arrangements.

How TDC turns a site idea into a project ready for discussion

01 · Assess site feasibility first Help assemble access, dwell-time, nearby-destination and electricity information. Local professionals verify supply capacity and construction permits.

02 · Make the proposal and investment clear Compare equipment, power, connectors and phased expansion. Provide equipment lists, quotations, platform and service scope so the landowner can compare leasing, self-operation and joint investment.

03 · Prepare approval and financing materials Supply applicable specifications, equipment quotations, test and service information, working with local advisers and contractors on project documents. Banks and authorities independently assess eligibility.

04 · Support long-term operations with delivery and operating records Agree installation acceptance, platform integration and repair responsibilities. Authorised access to energy, transaction and settlement records helps owners monitor actual performance.

How can governments and banks support development?

Thailand · Commercial-bank finance

KBank EV Charger advertises financing of up to 100% of equipment and installation investment, for up to seven years. Applicants must be Thai-registered legal entities using an installer that participates in the programme and has passed the bank's assessment. Credit, security and limits are subject to bank approval. TDC can provide equipment information; this does not establish approved-installer status or guarantee a loan. [2]

Thailand · Investment promotion

The BOI's 2026 guide lists charging-station promotion categories: projects with at least 40 chargers, at least 25% of them DC, fall under A3; other cases are listed under A4. Smart-charging or platform-connection plans and compliance with the relevant authorities' safety requirements are also required. Project scale and eligibility are assessed individually; owning land does not automatically confer incentives. [3]

European Union · Signed financing example

EIB and Galp signed a total of EUR 63.5 million in loans in 2021–2022 for a charging-network project involving 5,500 points in Spain and Portugal. This illustrates access to long-term funding for an established network project. It is a historical operator-financing example, not a subsidy open to every landowner. [4]

In other countries, explore green business loans, local infrastructure programmes or joint investment with an operator. Confirm currently available schemes, the borrower, lease duration and power availability before including support in a financial model.

Your next step: bring six essential pieces of site information

Location and land-use rights; usable area; access and parking circulation; existing electrical information; surrounding traffic and destinations; and your preferred partnership model. TDC and regional partners use these to assess initial scale, investment responsibilities, acceptance and the service plan after opening.

Data definitions and sources

The commercial study uses a California sample and cannot be directly extrapolated into land-price increases elsewhere. All before-and-after figures above are adjustable illustrations, not actual TDC transactions. Banks and institutions are cited to explain publicly documented support routes, without implying a TDC credit, authorisation or partnership relationship.

  1. Nature Communications (2024): charging stations and local business spending; DOI 10.1038/s41467-024-51554-9 ↗
  2. KASIKORNBANK: EV Charger financing, applicant and installer conditions ↗
  3. Thailand BOI, Investment Promotion Guide 2026: activity 3.17.1, printed p.123 / PDF p.116 ↗
  4. EIB: GALP EV SUSTAINABLE CHARGING NETWORK, signed loans and project details ↗

Sources checked on 22 November 2026. Historical results, policy targets, corporate plans and analytical scenarios are identified separately. Eligibility is governed by the current rules of the relevant local authorities.

Submit the site location and plan ↗
STATION ECONOMICS

Nine revenue streams for one charging station

A driver's charging visit can generate charging transactions, spending and commercial exposure. Owners can select suitable revenue sources around vehicle traffic, space and operating rights.

Electricity & energy

Charging service fees

Drivers pay the agreed charging tariff. Each transaction records energy, unit price and actual receipts.

Revenue basis: energy sold × tariff
Solar generation

Canopy solar used on site reduces grid purchases. Where electricity sales are authorised, exported energy is settled under the applicable contract.

Separate self-use savings from export revenue
Storage tariff optimisation

Charge batteries when tariffs are low and supply the site when tariffs are high to reduce peak electricity purchase costs.

Deduct losses and battery wear from savings

Spending during visits

Vehicle services

Drivers can purchase washing, detailing or inspections while charging. Operate directly or provide space to specialist merchants.

Revenue basis: service fees or agreed share
Food & beverage

Coffee and light meals serve waiting customers. Direct operations deduct food and labour costs; outsourced businesses contribute rent or an agreed share.

Track the share of visitors who spend
Retail

Convenience stores or vending machines can supply drinks and travel essentials, with product selection and replenishment adjusted to traffic patterns.

Track basket size and merchandise margin

Space & operating services

Driver rest facilities

Paid rest areas, showers or reservation services can serve long-distance drivers. Free rest areas can encourage repeat visits.

Pricing: per use or time period
Station management

Manage equipment, transactions and settlements for owners, charging contracted management fees or an operating revenue share.

Paid by the commissioning site owner
On-site lightbox advertising

Lease canopy, waiting-area or shopfront lightbox space to brands for agreed periods, locations and maintenance responsibilities.

Revenue basis: leased positions × term

Rules for the investment model Count only the receipts belonging to the party whose return is being assessed. With leased shops, the landowner records rent and the merchant records sales. If solar self-use and storage savings already reduce electricity costs, count them once. Include the capital and maintenance costs of additional facilities.

INVESTMENT CASE

How many daily arrivals can the station serve—and when does it pay back?

Enter expected arrivals, then adjust charger quantity and rated power per charger to compare capacity, monthly operating profit and payback. The default uses the planned King Kaeo site's three 240 kW dual-connector units and THB 6,000,000 total investment. Traffic and tariffs are adjustable examples.

Your site assumptions

Monthly operating profit 297,960 THB/month
Estimated payback 20.14 months Approx. 1.68 years
Total station rated power
—
Theoretical daily session limit
—
Daily sessions included in revenue
—
Monthly energy sold
—
Monthly charging revenue
—
Less: electricity purchase cost
—
Less: bank/payment fees
—
Less: site operating costs
—
Net service contribution per kWh
—
Total daily connector-hours
—

How does equipment configuration affect profit?

Assume 40 kWh per session and two bays per charger, with both connectors sharing the unit's power. Under simultaneous charging, average power per connector is the lower of half the unit rating and 120 kW. At the default configuration, each connector averages 120 kW and a session requires about 20 minutes of charging.

Theoretical daily capacity = chargers × 2 connectors × average connector power × 24 hours ÷ 40 kWh, rounded down. Revenue uses the lower of expected arrivals and capacity. The model assumes 24-hour opening, evenly distributed arrivals and adequate power; actual throughput also depends on peak queues, vehicle changeover and availability.

Monthly energy sold = included daily sessions × 40 kWh × 30 days. Net contribution per kWh = charging tariff × 95% − purchase tariff, with bank/payment fees equal to 5% of charging revenue. Monthly operating profit = monthly energy × net contribution − monthly operating costs. When profit is positive, payback months = investment ÷ monthly profit; payback years = months ÷ 12.

When comparing configurations, update investment and monthly operating costs as well. Additional equipment increases charging revenue only when existing capacity is insufficient and matching demand exists.

The model holds traffic and tax treatment constant and assumes purchased energy equals energy sold. Operating costs may include staffing, rent, maintenance and capacity charges; electricity and bank fees are separate. This is a simple pre-tax, pre-financing and pre-depreciation estimate, excluding ramp-up, conversion losses, equipment replacement and other revenue streams.

Discuss your site's cash flow ↗
OPERATIONS & AFTER-SALES / FIVE STATION WORKFLOWS
STATION WORKFLOW 01 / 05

Opening acceptance

The owner needs to confirm that a driver can find the bay, complete charging and obtain a traceable transaction. Acceptance follows that journey step by step before the owner takes over operations.

01 / Owner & engineering team Check the delivery list

Match serial numbers, connector IDs, bay markings and agreed configurations unit by unit. The engineering team provides installation and inspection records.

02 / Platform & station staff Complete a driver's journey

Test each connector under the acceptance plan: select in the app, start, stop and check energy and cost, while verifying the back-office site name, tariff and status.

03 / Owner & TDC Sign off and hand over

Retain test transaction IDs, results, operating instructions and fault-report contacts. Assign owners, deadlines and retest dates for outstanding items.

Field scenario

Suppose the bay is marked “2A” but the app shows “2B”. Even if the vehicle receives power, the mapping needs correction. The team corrects connector IDs and repeats a test from the driver's side.

What completes this stage? Deliver acceptance records, per-connector results and the outstanding-item list. The owner confirms equipment that may open under the contract, and station staff can demonstrate a session independently.

STATION WORKFLOW 02 / 05

Fault intake

When a driver says “I can't charge”, identify the bay and action involved first. The service contact helps the driver, then turns the symptoms into a traceable ticket.

01 / Driver & station staff Identify site, connector and time

Record the site, connector, fault time, screen message and transaction ID. If no transaction exists, record which start-up step failed.

02 / Support contact Establish the impact

Check connectivity, platform transactions and other connectors to distinguish single-connector, whole-site and payment issues. If a hazard is suspected, suspend the affected position and arrange qualified assistance.

03 / Service coordinator Create a ticket and respond

Record the ticket ID, scope, current action, responsible person and next update time. Route it to platform, payment or engineering teams as agreed.

Field scenario

For example, connector A is offline while B remains available. Staff confirm B can serve before helping the driver move; support preserves A's timing and records for engineering investigation.

What completes this stage? The driver or owner receives a reference number and update arrangements. The ticket clearly identifies suspended positions and equipment still available.

STATION WORKFLOW 03 / 05

On-site repair

If remote records cannot restore service, the local engineering team takes over. Owners need to understand the impact, the scope of work and when retesting can begin.

01 / Dispatch coordinator Prepare the site information

Give engineers connector IDs, error records, equipment versions and actions already tried. Confirm warranty scope, spares, access permissions and potential costs under the contract.

02 / Qualified engineers Inspect and carry out the work

Staff mark suspended bays. Engineers follow manufacturer procedures and site rules, compare the reported symptoms and record findings, actions and replaced parts.

03 / Engineer & station staff Hand over for retesting

Record arrival and repair completion times, parts used and outstanding work. Keep the affected connector's service status clear until the retest team takes over.

Field scenario

If a communication component needs replacement, the repair record identifies the old part, new part and equipment serial number. If spares have not arrived, the service contact advises the owner which positions remain suspended and the replacement plan.

What completes this stage? Keep a traceable repair record. Repair completion means the equipment is ready for retesting; the basis for reopening is covered next.

STATION WORKFLOW 04 / 05

Return-to-service test

A screen lighting up after a part change is only the start. Restoration testing must show that drivers can complete charging, the platform receives the transaction and the original error does not recur under the test conditions.

01 / Engineering & platform teams Confirm reconnection

Check site name, connector ID, communication status and alerts. Set the test scope from the original ticket, including the other connector on the same unit where needed.

02 / Test personnel Repeat the fault scenario

Reproduce the previously failed step, then complete start, charging and stop. Record time, energy, end status and back-office transaction ID.

03 / Station staff & service contact Authorise reopening and follow up

Authorised personnel approve reopening as agreed and update site and app status. If testing fails, continue on the original ticket and retain before-and-after records.

Field scenario

Continuing the offline connector A example: after repair, complete a test transaction on A and confirm that the platform shows it as available for the next driver.

What completes this stage? Attach retest results, transaction ID, reopening time and approver to the original ticket. The owner can calculate downtime and monitor recurrence.

STATION WORKFLOW 05 / 05

Payment reconciliation

A transaction leaves three records: energy delivered, money collected by the platform and the amount credited to the bank. Reconciliation connects them using transaction IDs and settlement batches.

01 / Station staff & platform Check charging transactions

Export completed transactions for one settlement period. Check totals by site, connector, energy and applicable tariff, separating test sessions, cancellations and refunds.

02 / Platform & finance Check settlement details

Check service, payment and withdrawal fees, refunds and applicable taxes against the authorisation agreement, identifying what has already been deducted and what is charged separately.

03 / Owner's finance team Match bank credits

Match batch IDs, remittance dates and amounts to bank records. Carry forward unsettled amounts, investigate duplicate fees or unexplained differences through tickets, and archive completed reconciliations.

Field scenario

Training example: a batch totals THB 10,000, confirmed refunds are 200, agreed deductions are 300 and other adjustments are zero, giving an expected transfer of 9,500. If the bank shows 9,400, flag 100 for investigation, then check the batch and fee evidence. Figures are illustrative only.

What completes this stage? Deliver the period's transaction list, settlement statement, bank credits and difference register. Each difference has an amount, reason, owner and expected resolution date.

BUSINESS DEVELOPMENT

Start the next conversation with a real project

Distributors: bring your first target customer and vehicle type. Landowners: bring the address, site plan and electricity bill. Investors: bring your budget, holding period and acceptable payback. Together we will define the site survey, initial configuration and next investment decision.

Contact the business team ↗

info@tdc-energy.com · www.tdc-energy.com